« Back to Gallery
  • brock environmental center april

    (1 of 5)

  • brock environmental center april

    (2 of 5)

  • brock environmental center april

    (3 of 5)

  • brock environmental center april

    (4 of 5)

  • brock environmental center april

    (5 of 5)

Previous
Next

April Construction Progress Photos

During April, the construction team began the installation of the mechanical and electrical system as well as the exterior skin of the building, which includes the exterior reclaimed cypress wood siding and triple glazed window systems.