  • brock environmental center march photos

    Construction progress as of March 6, 2014. (1 of 5)

  • brock environmental center march photos

    Construction progress as of March 13, 2014.(2 of 5)

  • brock environmental center march photos

    Construction progress as of March 21, 2014. (3 of 5)

  • brock environmental center march photos

    Construction progress as of March 26, 2014. (4 of 5)

  • brock environmental center march photos

    Construction progress as of March 31, 2014. (5 of 5)

Previous
Next

March Construction Progress Photos

There was much construction progress during the month of March. The large radius structural steel roof beams for the multipurpose room and the education pavilion were installed. The exterior wood framing and sheathing for the balance of the main building system were completed around the end of the month. Starting in April, the insulation and metal roofing panels will be installed on the main building.